Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114
Alamen City University – instudio-engineers
3 Mossadak Street,17th floor, Dokki, Giza, Egypt.

Alamen City University

Project Details
1
Location: 
Alamen New City, Egypt
Status: 
Delivered
Category: 
Educational
Client Name: 
Redcon Construction
Consultant: 
IDG
Owner: 
New Urban Communities Autority

SCOPE OF WORK:

  • Landscape
  • Shop Drawings
Project gallery
1
similar Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!