Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114
Palm Park – instudio-engineers
3 Mossadak Street,17th floor, Dokki, Giza, Egypt.

Palm Park

Project Details
1
Location:
 5th Settlement, Egypt
Status:
 Completed
Category:
 Residential
Client Name:
 CRC – Dorra
Consultant:
 ECG
Owner:
 Emaar Misr

SCOPE OF WORK:

  • Shop drawings
  • Coordination with other disciplines
PROJECT GALLERY
1
SIMILAR PROJECTS
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!