Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/in-studio/wp-includes/functions.php on line 6114
West Bus Central Station (WBS) – instudio-engineers
3 Mossadak Street,17th floor, Dokki, Giza, Egypt.

West Bus Central Station (WBS)

Project Details
1
Location:
 Doha, Qatar
Status:
 Completed
Category:
 Transportation
Client Name:
 Factum
Consultant: 
Dar al Handasa + AECOM
Owner: 
The Public Works Authority “Ashghal”

SCOPE OF WORK:

  • Structural shop drawings
  • Coordination
  • 4D simulation